Weinman® HVAC Provides High Efficiency, Low Maintenance for over 20 years

Web Admin CranePumps Case Studies

Weinman hot, chilled, condenser water service SITE/LOCATION: Boston, MA High-rise office building in Boston’s financial district. HVAC hot water, condensed hot water and chilled water application outfitted with 21 Weinman Pumps, combination of 8L2 1200 Series, 6L2 1200 Series and 500 Series. PROJECT FEATURES: Large capacity, 2.5 acre footprint High traffic, downtown location. WEINMAN 1200 & 500 SERIES FEATURES: High Efficiency Long Pump Life Economical Cost Quiet Operation Easy Routine Maintenance Quality Construction In the heart of Boston’s financial district …

Barnes Replacement Core Unit Eliminates Maintenance Costs

Web Admin CranePumps Barnes, Case Studies

The Barnes® Pressure Sewer Solution SITE/LOCATION: Fremont, WI Orihula Sanitary System installed in 1998 with 150 progressing cavity pumps. PROBLEM: Expensive, frequent main flushing required to keep one of the pressure sewer’s segments, Red Oaks, from clogging. The clogging was due to the inability of the progressing cavity pumps to adequately flush solids from the 3” pressure main. SOLUTION: Crane Pumps & Systems modeled the Orihula Sanitary System using sophisticated piping software, illustrating to Fremont Plumbing & Heating the benefits …

Less Grease, No Odor, No Clogs for WK North Medical Center

Web Admin CranePumps Barnes, Case Studies

The Barnes® SH Series Solution SITE/LOCATION: Shreveport, LA WK North Medical Center Hospital Wet-Well duplex station transfers the hospital’s kitchen and basement wastewater into the City of Shreveport’s manhole approximately 300’ away. Previously outfitted with two Weil 7.5 HP submersibles. PROBLEM: The submersible pumps in the WK North Medical Center’s duplex station were being clogged by grease buildup and dish rags. SOLUTION: Delta Process Equipment introduced WK North Medical Center to Crane Pumps & Systems’ Barnes 4SH Series. Two 4SHM …

Clogging Eliminated and Costs Reduced at Oak Hill Estates

Web Admin CranePumps Barnes, Case Studies

The Barnes® SH Series Solution SITE/LOCATION: Holly, MI Oak Hill Estates mobile home court, wastewater treatment plant outfitted with Flygt 3085 pump transferring raw sewage from equalization tank to batch reactor. PROBLEM: Frequent clogging caused by large raw sewage solids required inconvenient and repetitive service calls, often during overnight hours and inclement weather. The pump was clogging multiple times a week, sometimes causing the pump motor to overheat and fail requiring even more repair maintenance and potential for the tank …

Pressure Sewer Advantage for Lake Community with Failing Septic Systems

Web Admin CranePumps Barnes, Case Studies

The Barnes® Pressure Sewer Solution SITE/LOCATION: Macy, Indiana Rural, lake community with a mix of full year and part-time residences. 255 stations with 8 miles of pipe PROBLEM: Individual septic tanks were failing due to the age of the systems and from the high water table in the area. As the septic systems failed, the water quality of the lake deteriorated. State and federal water quality mandates made it nearly impossible to obtain permits to install or repair septic tanks. …

Barnes SH solves maintenance issues in Bradford, OH

Web Admin CranePumps Barnes, Case Studies

MUNICIPALITY OVERVIEW: The Village of Bradford is a small rural community in western Ohio. It is located in Darke and Miami counties, and has a population of nearly 2,000 people. Bradford’s waste water treatment plant mainly receives sewage from residences, a couple of factories and a few commercial businesses. The treatment plant’s design capacity is 0.5 MGD. LIFT STATION DETAILS: Bradford’s master pump station is a triplex station with three 6″ solids handling submersible non clog pumps. Bradford was experiencing …

Solving Costly Clogging Issues at Inkster’s Lift Station

Web Admin CranePumps Barnes, Case Studies

Barnes® SH Series Solution SITE/LOCATION: 1 MGD CSO triplex lift station (Inkster,MI) outfitted with three Flygt CP3102 5HP 230v/3Ph pumps for 350gpm @ 23 FT TD PROBLEM: Persistent clogging of impellers caused by accumulation of typical household items demanded around-the-clock attention to keep the station running. Inkster’s Lift Station connects into Detroit Sanitary Sewer System and therefore when pumps clog the overflow is diverted to a retention pond. The wastewater from the pond is vacuumed and transported to the treatment …